Blackbox – Stop Motion non stop
Room U157
Puppet animation claims its place. In the cinema, in the curriculum, in our premises. Flexible workstations can be partitioned off on 100 m2 with movable walls. This makes it possible to cover first-semester exercises with large-scale Master Film works at the same time, including sufficient equipment from the small Dedo to the motion control robot.
Blackbox preparation – puppet hospital and world building
Room U156
Everything you need for set and puppet construction is available in our own workshop: Soldering station, power tools, 3D printer and much more. And for the really thick boards, it's not far to the big workshops.